Back to the pipeline construction…
The water tank is 13’ across… It is a tire from some huge piece of mining equipment that’s been cut in half. It was quite the sight to see. It had a few inches of water in it from the recent rains adding to its weight. They couldn’t lift it enough to pour it out though.
The plan is to pipe water clear to the big storage unit, then gravity flow the water down to this tank.
That’s the delivery pipe centered on the flattened area.
Final details will be added… And the pump will be placed in the creek as soon as the high water retreats!